Thread: Latest project.
View Single Post
  #8  
Old 06-19-2019, 07:22 AM
Hank70SS's Avatar
Hank70SS Hank70SS is offline
Moderator
 
Join Date: Dec 2009
Location: Brighton, MI
Posts: 4,719
Default

DTE hooked up the underground service. I just need to remove the old meter box and riser. Have a few more sections of railing to install then the facia. The facia boards are 12' long and 12" wide, I need to rip them all down before I can install them. Azek says not to let the facia overhang the rim joists and mine are 2x8's.
__________________
Hank

70 Chevelle SS396(454), M20, 3.73
My Chevelle
Reply With Quote