ChevelleForum.net

Go Back   Chevrolet Chevelle Forums > Chevrolet Chevelle Car Talk > Chevelle General Talk
Register FAQ Chevelle Chat Room Community Calendar

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 05-31-2013, 07:36 PM
melonhead melonhead is offline
Member
 
Join Date: Apr 2013
Location: Northern MN
Posts: 75
Default

well, not so much today but lately. brakes are completely done, new master, proportion valve, line lock, lines and hoses and bled already. no leaks made me happy.
new steering is now complete, replaced the gearbox, pitman and rag joint.
I need to double check a few things, and make one modification to the trans pan. and then I can install the motor
__________________
72 Chevelle - F2 427sbc, TH400, & 3.50s in a 9"
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 11:43 AM.



Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.
Audiokarma.org