ChevelleForum.net

Go Back   Chevrolet Chevelle Forums > The Backyard meeting spot > Off Topic

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 01-11-2016, 02:33 PM
shadowgray396's Avatar
shadowgray396 shadowgray396 is offline
Senior Member
 
Join Date: Dec 2009
Location: Oregon City, Oregon
Posts: 6,062
Default

Frame off project continues. Took out all the 1947 floors and now down to the original sub floor. Now its time to level and build the floor over the concrete floor over to the front door. Looks different now that all the inside walls are down and opened up. French doors are in, can now heat a room to sleep in. Gas line gets installed in about 2 weeks. Hot shower will be nice.

Wife cleaning the floor

Looking toward the kitchen and laundry room, with the wall now gone.

Front room area, need to extend the floors toward the front door. Old wood floor is where the house used to end.
__________________
Ray
1970 SS Chevelle Van Nuys Built
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 04:57 PM.



Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.
Audiokarma.org