ChevelleForum.net

Go Back   Chevrolet Chevelle Forums > Chevrolet Chevelle Car Talk > Chevelle General Talk

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 03-20-2016, 07:17 PM
paulywood paulywood is offline
Senior Member
 
Join Date: Sep 2014
Location: Mid-Michigan
Posts: 127
Default

Finished up the wiring in the engine compartment and put the engine back in, hopefully for the last time this spring. Even put the bolts in the motor mounts. Finished up the wiring for the gas gauge and mounted the license plate light. Pulled the battery tray out, a battery must have leaked at some point because it was new but it's in rough shape. I sprayed it and the fender black after taking the wire wheel to them. Cleaned out the passenger compartment and started on the dash wiring. Disassembled the dash, cleaned it all up, painted the supports and started putting it back together. Removed the passenger side rear window and all associated hardware. The teeth that hold the window crank on are stripped. Have to figure out what I want to do with that. Very productive weekend for me.
__________________
1972 Chevelle Malibu Convertible Project
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 11:38 PM.



Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.
Audiokarma.org