![]() |
|
#2
|
||||
|
||||
|
Okay todays adventure was pretty much ordering the top end. Took for ever for the bank to let the money go through. Out of my spending habits it seems.
I got the 320cc BB-2 PLUS CNC Ported top end kit. My engine builder sounded real excited I shot the wad. Now the waiting. Brodix is way bogged down and said 8-10 weeks shipping time. I said cool my builder is loaded down to so he be happy get some of the other stuff out of the way. |
| Thread Tools | |
| Display Modes | |
|
|