![]() |
|
|
|
#1
|
|||
|
|||
|
Andrew did some flooding around there, but I don't know if the winds get that far inland to do a lot of damage. The County makes all new builds meet the Florida hurricane standards, so maybe they do. There are flood-level marks on some of the trees that are pretty high. Yep, around 80 miles or so.
|
|
#2
|
|||
|
|||
|
Looks like a 3 hour drive up from port charlotte.
Is the big daddy don garlits museam in ocala. Did you put in a berm for your range. |
|
#3
|
|||
|
|||
|
Quote:
No berm yet, but I have a pretty good sized pile of dirt that I've shot into. After everything is inspected, I'm going to take some of the dirt from the stupid-ass " Engineered Storm water retention berm" and use that. |
|
#4
|
|||
|
|||
|
We got the interior ceilings, walls, all the backing, trays, and plumbing done in two weeks. That was just my brother Doug and I doing everything. When I got down there and saw the stacks and stacks of lumber and all the plumbing supplies, I thought "no way in hell are we going to get this done in two weeks". Surprised myself, being as we are both getting up there in years.
![]() ![]() ![]() ![]() ![]()
|
|
#5
|
|||
|
|||
|
|
|
#6
|
|||
|
|||
|
|
|
#7
|
||||
|
||||
|
Great job Tony...that new stint is really working for you.
__________________
Ric Beckman ![]() 1969 Chevelle SS396 1972 Camaro SS350 |
|
#8
|
||||
|
||||
|
WOW !!! You are making great progress. I especially love the bathroom sign !!
__________________
Get in, sit down, shut up, hold on...cause Ms Grumpy is driving ! For the audio geek try: www.audiokarma.org |
|
#9
|
||||
|
||||
|
That's a lot done in two weeks. Looking good.
__________________
Ray 1970 SS Chevelle Van Nuys Built |
|
#10
|
||||
|
||||
|
I all I can say is WOW, what a great place you got. I'm sure you being a plumber and Doug a builder helped things go faster, still you old farts got a lot of work done.
|
![]() |
| Thread Tools | |
| Display Modes | |
|
|