ChevelleForum.net

Go Back   Chevrolet Chevelle Forums > The Backyard meeting spot > Off Topic
Register FAQ Chevelle Chat Room Community Calendar

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #5  
Old 04-25-2016, 02:29 PM
paulywood paulywood is offline
Senior Member
 
Join Date: Sep 2014
Location: Mid-Michigan
Posts: 127
Default

Quote:
Originally Posted by shadowgray396 View Post
Have you been able to move back in yet?
Not yet. They poured the concrete today. Should be able to put the car back in on Friday. It ended up being a bigger job than they originally thought. The issue was that the sand they backfilled with had enough clay in it that it blinded off the fabric on the weeping tile. So the tile was actually sitting in water but the water couldn't get through fast enough. That caused water to pool around the foundation and eventually find a way in.

They ran new tile to the crock, plus a 2nd one that gravity drains out 50 yards from the house on it's own. They also extended the tile I had for the downspout along with that tile. Sealed up every penetration in the foundation again and also brushed on another layer of tar. Backfilled with a few feet of pea stone before putting the dirt (sand in my area) back in. Had to cut out most of the front sidewalk so that's new also.

They did everything they could think of while they had it open. They don't want to come back anymore than I want them too.
__________________
1972 Chevelle Malibu Convertible Project
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 11:02 PM.



Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.
Audiokarma.org